A utility substation upgrade requires more than additional transformer capacity. The equipment must also support stable voltage conversion, predictable maintenance and safe integration with existing protection systems. This application case outlines a practical three-phase oil-immersed transformer solution for capacity expansion.
Project Requirement
Application
Utility substation capacity upgrade
Recommended Product
Three-phase oil-immersed distribution transformer
Engineering Focus
Load growth, protection coordination and maintainability
Transformer Solution
The transformer configuration is selected around the site load profile, primary and secondary voltage, impedance, cooling method and installation environment. A robust tank structure, proven insulation system and accessible accessories help support dependable operation throughout the service life.
Implementation Highlights
Ratings matched to actual demand and planned load growth.
Protection interfaces coordinated with upstream and downstream switchgear.
Layout planned for safe lifting, inspection and routine maintenance.
Final accessories confirmed against project standards and ambient conditions.
Project Outcome
The resulting solution provides a clear path for substation capacity expansion while keeping operation and maintenance straightforward. Project-specific electrical parameters can be customized after review of the single-line diagram and load data.
Antes de definir as especificações do seu projeto, compare os transformadores de tipo seco e os imersos em óleo em termos de refrigeração, instalação, manutenção, segurança contra incêndios, eficiência e aplicação.
Localização: GANSU, CHINA Capacidade instalada: 720 MWh Aplicação: Central de armazenamento de energia Produtos utilizados: MCCB, ACB, contactor CA, interruptor de isolamento
Enviar um pedido de informação sobre o produto
Entraremos em contacto consigo no prazo de 24 horas